As BIM operator, PROJECT GROUP HC LLC provides assistance for the digital twin-based construction of the Booster compressor station at the Onshore processing facility (OPF BCS) of the Sakhalin-2 project on Sakhalin island. It is the vast experience and professionalism of the PROJECT GROUP PMC staff, combined with seamless cooperation and mutual trust between PROJECT GROUP HC LLC and SAKHALIN ENERGY that has become the prerequisite for the success of the project.
Т: +7 (495) 215-16-79
E-mail: info@project-group.ru
Akademika Pilyugina str., 22, Algorithm Business Center, 2nd floor Moscow 117393 Russia